战略一代

战略生产计划常见问题

How does the natural gas shortage in the Cook Inlet 影响 GVEA members?

GVEA的购买量约为17.每年有4%的电力来自天然气. GVEA has evaluated multiple proposals to look for ways to economically transport 大量 向阿拉斯加内陆输送天然气. 目前, 没有负担得起的前景,可以在当地交付到阿拉斯加内陆所需的数量, after taking into consideration necessary transportation and storage 成本. . 目前, none of GVEA’s owned generation units 是 set up to 利用 natural gas fuel s我们的ces, however, GVEA could easily convert 它的北极联合循环装置 to natural gas if it became 可用 in the necessary quantities. GVEA目前与ENST有一份合同AR天然气 购买 1 billion standard cubic feet of natural gas annually through January 2025. Chugach电气协会在他们的一个发电机组中燃烧天然气,并将电能输送到Intertie到GVEA, 但截至2024年2月,GVEA没有多余的天然气能源可供购买. GVEA is working collaboratively with other Railbelt utilities to 探索可以为阿拉斯加铁路带的居民和企业提供全系统利益的天然气供应替代方案. 

GVEA的大规模风电rfp进展如何?

在SGP通过后的几个月里, GVEA与一个独立的第三方合作,为一个40 - 150兆瓦(MW)的风力系统开发了一份征求建议书(RFP). RFP于2023年8月结束,GVEA目前正在与两家最终投标人就潜在的购买力协议(PPA)进行谈判.  然而, 将风引入GVEA系统的能力取决于GVEA获得足够的能量储存. 能源储存将为风能或太阳能等可变发电提供调节,以确保始终如一的电力输出. 没有适当的能量储存, GVEA必须对我们现有的化石燃料发电来源提供这些可变资源的监管, which would ultimately make the proposed projects uneconomic.  

PPA是GVEA及其成员的理想选择, as we would not be required to provide the capital outlay to build the project, nor would we be responsible for any of its maintenance or operations. GVEA would simply 购买 the system’s electric output for a set price, 只为我们得到的力量付费.  

What is the Grid Resilience and Innovative Partnerships Program (GRIP)?

阿拉斯加能源管理局(AEA)获得206美元.500万年 for Grid Resilience and Innovation Partnership (GRIP). 获批的铁路带创新弹性(RIR)项目将建设一条高压直流(HVDC)海底电缆,作为从基奈半岛到安克雷奇的平行输电线路, creating a much-needed redundant system in case of disruptive events. 除了, RIR项目将为铁路带公用事业各自推荐十大正规网赌平台区域内的多个电池储能系统(BESS)提供资金, with a focus on the central and northern regions of the Railbelt electrical grid. The project is estimated to take eight years to complete. The AEA grant is subject to state or utility 成本 matching of $206.500万年, 哪个GVEA和铁路带公用事业公司目前正在游说阿拉斯加州将配套资金纳入州预算,以限制纳税人的影响. 

这是AEA和Railbelt电力公司正在进行的一系列项目中的第一个项目,旨在显著改造Railbelt电力系统. Concept papers under the second round of GRIP 一直在 submitted to the Department of 能源. 一个是系统的传输“骨干”, 哪一个需要升级和额外的冗余. The other proposes the extension of the aforementioned HVDC line north to Healy, 为内陆地区提供低成本的电力, 降低会员的成本. We 是 seeking the state’s support 以确保 future funding for this plan, 能使阿拉斯加的城乡居民受益. 

GVEA将如何支付SGP中包含的所有费用?

GVEA正积极通过《推荐十大正规网赌平台》和《推荐十大正规网赌平台》寻求联邦资助机会. 这是千载难逢的机会,为像GVEA这样的电力合作社开辟了以降低费率的方式过渡到非化石燃料电力来源的可能性, 维护可靠性, 减少碳排放. If GVEA awarded funding, it would further reduce project 成本 and/or PPA pricing to members.  

其中一个机会就是通过美国农业部农村公用事业推荐十大正规网赌平台局(RUS)开展的赋权美国农村(New ERA)项目。, 谁是我们的主要金融贷款人. GVEA于2023年9月根据新时代提交了一份意向书,项目总额约为6.02亿美元,并很高兴在申请过程中取得进展. 意向书中的项目包括:  

  • Developing a power 购买 agreement for up to 150MW (w)ind generation  
  • 增加额外的存储,以150MW/300MWh锂离子电池储能系统的形式集成可变风力发电  
  • Building out the 138kV system and associated substations to interconnect the proposed wind   
  • 对希利2号机组退役后的债务进行再融资,并将节省下来的贷款利息进行再投资   

RUS下的另一个联邦资助机会是电力负担得起的清洁能源(PACE)计划. 2023年7月, GVEA submitted a letter of interest and later received an invitation to submit a full application. 金融, 工程, 监管, 法律和电力供应在各种顾问和赠款撰写人的协助下合作编写了这个一揽子计划, 最终将于2023年11月提交申请, 并于5月31日提交修订后的社区福利计划, 2024. For more information on the 社区 Benefit Plan, click 在这里. 最终的项目申请包括:  

  • A 46MW/92MWh Li-ion battery 能源 storage system (BESS)  
  • A power 购买 agreement with a 16MW solar facility to be installed in Nenana  
  • Upgrades to the Nenana Substation and infrastructure to interconnect the solar facility  

GVEA submitted for the maximum possible loan and loan forgiveness amount totaling $100M. The BESS submitted under PACE would be eligible for 60% loan forgiveness,  and would also be eligible for an additional 30% investment tax credit.  GVEA expects to learn whether or not we 一直在 awarded a loan and loan forgiveness in Q3 2024.   

For any 成本 not covered under grants or loan forgiveness, GVEA将为这些设施寻求贷款, which 成本 would ultimately be paid back over time by members through electric 利率.  

风能能可靠地取代希利2号机组吗?

Non-dispatchable 风能和太阳能等发电不能取代任何形式的可调度的热能发电. However而风能和太阳能则可以 潜水员ify GVEA’s portfolio and provide some level replacement power when t软管 可变资源s 生成 电力和注射 进入系统. It GVEA维护的必要性是什么s 生成的能力 所有的 我们的 成员的 完全没有电力需求 年度报告. A 结合 (w)印第安纳州、太阳能、蓄电池 and other forms of thermal dispatchable generation 可以 replace 第二小队和GVEA正在追击 具有成本效益的 这是实现梦想的好方法.  

Is GVEA moving away from coal/fossil fuels to reach its carbon reduction goal?

No. 第一单元是健康的 目前 GVEA’s cheapest, most reliable plant – it provides power fueled by coal. As part of the SGP, the board of directors voted to install a $26 million 选择性催化还原(SCR)系统 to 确保GVEA能够在未来几年继续运营. While GVEA will 继续 to work toward its carbon reduction goal, the cooperative will do so prudently and in a way that does not negatively 影响 比率与可靠性.   

GVEA什么时候让Healy 2号机组退役?

目前, there is no set 日期 when 希利单位 2 will be retired. 健康2号机组的退休是有条件的 on GVEA获得可靠的替代来源, -成本 能源. 虽然有 目前 no 退休 日期, s系统评估和计划 一直在 发达 以确保 希利单位 1该公司与希利2号机组共享系统 可以 继续 to 操作 一旦退休. 此外,GVEA 继续 空洞e 有机会重新设计Healy 2单元 这可能在单位退休时可用.  

Why was the decision made in June 2022 to retire 希利单位 2 and why was this deadline changed?

The reliability of 希利单位 2 has been volatile due to a wide variety of mechanical issues, despite incredible efforts by GVEA employees and contractors. 该电站仍在发生计划外停电, 迫使GVEA用替代能源发电, 更昂贵的资源 影响 利率 尽管存在这些问题, 2024年2月, GVEA’s 董事会 adopted amendments to the SGP which removed the December 31, 2024, 退休日期. GVEA made the decision to 继续 operating 希利单位 2 because at this time, there 是 no 替代 s我们的ces of reliable, 低-成本 能源 to replace 希利单位 2’s generation. Ret在这个时候,没有 替代 电源会消极积极影响会员费率. 因此,GVEA将继续 操作 健康单元2尽可能安全和高效 直到 time 作为替代来源f 可靠,低成本的能源 成为 可用.

组件1的状态如何:在Healy 1上安装选择性催化还原(SCR)系统?

为了降低Healy 1号机组的氮氧化物排放,SCR的建设进展顺利,我们预计SCR将投入运行 2024年6月, 而且远远早于与环境保护局商定的2024年12月的最后期限. 希利单位 1 继续 be one of GVEA’s most reliable and 低est 成本 units, 我们相信H伊尔单位 1 will 继续 to produce at a high capacity fol低ing the installation of the SCR. 

What technologies or new generation s我们的ces were considered in developing the SGP?

GVEA analyzed over 120 different generation scenarios with internal staff, 顾问和GVEA董事会. The fol低ing technologies at various sizes were considered under the SGP: 

  •  
  • 太阳能 
  • 抽水蓄能 
  • 联合循环 
  • 天然气 
  • 电池储能系统 

该计划还考虑了GVEA系统中包括Healy 1号机组在内的各种机组的退役或延长, 健利2号机组Aurora能源电力购买协议, 等.   

Susitna等核电和水电由于技术的交付周期较长,没有包括在分析中.  

什么是策略性发电计划(SGP)?

战略发电计划(SGP)于2022年6月由GVEA董事会通过,并于2月27日修改, 2024. The SGP is the result of months of extensive review of GVEA’s generation portfolio by the board, 员工和辅助顾问. 该计划最初是为了解决美国环保署要求关闭希利1号机组或在工厂安装选择性催化还原系统的问题. To ensure that decisions such as this remain consistent with 我们的 mission to provide safe, 为我们的会员提供可靠和负担得起的电力, 当时考虑了所有可用的选择. 该计划最近进行了更新,以解决自最初计划宣布以来发生的变化,例如大量联邦拨款机会的可用性以及Cook Inlet天然气的持续限制. SGP专注于确保发电的多样性,从而降低成员的成本并提高可靠性. The plan, as modified, includes the fol低ing five components: 

  1. Install a selective catalytic reduction (SCR) system on 希利单位 1 in 2024. 
  1. Continue operating 希利单位 2 直到 time 作为替代来源f reliable, 更低成本的能源变得可用. 
  1. 完成电力购买协议的谈判,将大型风力资源整合到GVEA的系统中,其价格将降低GVEA成员的总体电力成本. 
  1. 安装足够规模的储能系统,以帮助GVEA将大规模可再生资源整合到GVEA的系统中. 
  1. 继续努力确保30-50兆瓦的可靠发电, 更低成本的能源,以协助GVEA推荐十大正规网赌平台其成员.